03.4Services
Urban Transformation
Renewal of buildings classified as at risk under Law No. 6306: architectural consultancy and design from the owners’ agreement to handover of the new building.
AWho it is for
Owners of buildings with a risk assessment; building management boards; developers working on urban renewal.
BDuration
Preliminary design 3–4 weeks; the full process 6–18 months depending on legal steps.
CDeliverables
- 01Guidance through the at-risk building procedure
- 02Preliminary design and area allocation for owners’ meetings
- 03Zoning analysis and schematic design
- 04Permit set
- 05Construction drawings and site supervision
DHow it works
- 01
Discovery
Brief and roadmap
- 02
Concept
Approved concept set
- 03
Design Development
Permit and construction drawings
- 04
Construction
A building that matches the drawings
EFrequently asked
- How do the owners reach agreement?
- We prepare a preliminary design that shows everyone’s area allocation clearly; transparency is what makes the hardest step easier.
- What should the contractor agreement cover?
- We prepare the technical specification and finishes schedule, so what you will receive is defined by drawings in the contract.